Interior Remodel – Part 6 of 8

After walking through the living room, kitchen, master bed and bath, two more bedrooms, and the guest bathroom, in this week’s post we take a moment to peer down the two hallways of this home, and see what they were and what they became.

One long hallway in the demo stage: 20160415_145946New freshly-painted drywall, COREtec® vinyl plank flooring, bold black doors with silver Weslock® doorknobs, and broad white trim make this a whole new hallway: IMG_1954And with a gallery of gold-framed portraits to give it character and make it home, this hallway is complete:2017-01-16 15.27.03

The same hall but from the other end. In this before photo, you can see the new CertainTeed® drywall, just installed:20160510_164554And the same completed hallway from this angle:2017-01-16 15.25.40

The other, shorter hallway with the new drywall installed but not yet painted:20160504_153146Here, too, we painted and installed new flooring, trim, and doors, as well as a new light fixture on the ceiling:IMG_1952And with the homeowner’s interior decor bringing touches of warmth and softness, this hallway is finished:2017-01-16 15.26.56

Not a complicated change, but wasn’t it fun to see? Next week, it’s time to remodel the pantry and utility room. Enter your email on the right or like our page on Facebook to be sure you don’t miss it.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s