Additions on House, Part 2 – Exterior & Entryway

We’ve looked at the outside and inside of addition number one. Now we’ll step around to the back side of the house and take a look at the second addition.

Here we can see the concrete slab in place, while the brick siding on the original part of the house is being removed:DCIM100MEDIADJI_0236.JPGThe new addition is framed, house-wrap and Tamko® Heritage shingles installed:DCIM100MEDIADJI_0260.JPGBrickwork in progress:20161017_09264820161017_092725The exterior of the completed addition:20180109_081724

Before and after photos looking out towards the door:Photo Dec 13, 11 12 55 AM20180109_081458A before and after of the entryway:Photo Dec 13, 11 13 23 AM (1)20180109_081054A closer look at the custom-built hall tree with storage cabinets and a bench:20180109_081145We installed a big sliding barn door on the entryway closet:20180109_081520And a glimpse of the utility room:20180109_081331

We’ve got one more post in this series, where we’ll look at the new bathroom and summer kitchen in this addition. If you want to be sure of catching that last post, enter your email on the right or like our page on Facebook.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s